Pre-Demolition Survey & Hazardous Materials

A pre-demolition survey course of 11 interactions and 5 validated competencies that walks learners through flagging asbestos, lead, mould, and other hazardous materials before a structure comes down. It builds the habit of identifying and controlling hidden materials rather than disturbing them.

For the people who plan and survey a demolition before work starts — competent persons, supervisors, estimators, and surveyors. Before a structure can be taken down safely, two questions must be answered: what hazardous materials are in it, and what is holding it up. This course is the pre-demolition survey and planning stage of the Demolition family.

Give the people who plan and survey a demolition the disciplined pre-work that keeps the job in control: the pre-demolition hazardous-materials survey (assume suspect materials are hazardous until tested), the rule that identified hazmat is assessed and…

At a glance

Who this course is for

Demolition and renovation workers, and survey personnel who identify hazardous materials in a structure before work starts.

What you will learn

Course outline

  1. The Pre-Demolition Survey — Find Out What’s in It First — The pre-demolition survey is a structured, whole-building walk done before any work starts, to find hazardous materials and confirm the…
  2. What the Survey Looks For — The Hazardous Materials — The pre-demolition survey looks for a defined list of hazardous materials, each found in predictable places: asbestos (lagging, tiles…
  3. Assess and Abate First — Hazmat Comes Out Before the Structure — Once the survey flags a hazardous material, the rule is a sequence: assess it, then abate or remove it BY QUALIFIED PEOPLE, with the work…
  4. Structure and Utilities — What Holds It Up, and What Feeds It — The other half of the survey is structure and utilities. A structural / engineering assessment establishes what is load-bearing, the…
  5. The Demolition Plan — Putting the Pre-Work Together — The written demolition plan brings the pre-work together in order: pre-demolition survey → assess and abate hazmat by qualified people →…

Laws and standards covered

Certificate and renewal

Passing the final test issues a QR-verified certificate, valid for three years. Pre-demolition survey and planning knowledge is best refreshed every 3 years, and sooner when a planner is newly assigned to demolition work, after a project where a hazardous…

Common questions

How long does Pre-Demolition Survey & Hazardous Materials take?

About 45 minutes online, over 5 modules, at your own pace. It ends with a final test that needs 80% to pass.

How long is the Pre-Demolition Survey & Hazardous Materials certificate valid?

Three years from the day you pass. Pre-demolition survey and planning knowledge is best refreshed every 3 years, and sooner when a planner is newly assigned to demolition work, after a project where a hazardous material or a live utility was missed, or when the type of structure or the applicable regulation changes materially.

Which laws and standards does Pre-Demolition Survey & Hazardous Materials cover?

Manitoba Workplace Safety and Health Act (C.C.S.M. c. W210); Manitoba WSH Regulation MR 217/2006; CCOHS — demolition and hazardous-material survey guidance; utility disconnection before demolition; and 1 more listed on this page.

Who should take Pre-Demolition Survey & Hazardous Materials?

Demolition and renovation workers, and survey personnel who identify hazardous materials in a structure before work starts.